Chunnel rail
link example was on the wrong track Sir, The very expensive Channel Rail Link (CTRL) is no basis for projecting the cost of a high-speed rail system for Britain. Eight hundred new route miles would be needed to satisfy Britain's principal transport requirements, which are headed by the need to get excessive traffice off the roads, not out of the air. The average cost per mile, allowing for difficult paths into Scotland and South Wales and including separate tracks for fast freight, is half the £74m per mile quote by Michael Woods (Letters, November 19) for the two CTRL tracks. When complete the
CTRL will erase the shame of the orginal route into Waterloo but will
have no perceptible effect on Britain's transport needs.
|
|
|||||||||||||||
|
|